Primary Bathroom Remodel

Location

Washington, dc

Type

Residential 

Duration

1 Week

PROJECT DESCRIPTION

We removed a shower with a step-up curb and replaced it with curbless shower (the lip, ledge, or raised floor in front of the shower), added double-vanity, single one-piece toilet, installed marble tiles on the walls floor-to-ceiling, floors are mosaic tiles from bathroom entrance into the shower.

Before & After Pics

View Full Gallery

View More Projects